Floating bridge uploaded

Read the original news 

Báo QĐND English - 50 month(s) ago 10 readings

Floating bridge uploaded

The Engineering Unit H49, under the High Command of Military Engineering, has uploaded the floating bridge which was built across the Duong river on June 10 while the Duong bridge was under repairs and upgrading.

After more than 3 months of operation, the floating bridge helped thousands as a means of transportation to daily cross the river. The bridge contributed to thoroughly securing traffic and safety allowing passage across the Duong river.

During this time period, the floating bridge was hit and seriously damaged by cargo ships. However, with a strong determination and professional skills, soldiers and officers of the army unit successfully repaired the bridge in the shortest amount of time to ensure safe and orderly traffic operations.

Hanoi’s Department of Transportation has instructed its agencies to be responsible for the traffic in the area where the army unit uploaded and removed the floating bridge.

Source: HNM

Translated by Duy Minh

There is no comment

Please Sign up or Login to comment.

Top page